1. design
  2. retrofit

intro

a carbon neutral victorian semi?

Read More
existing sash frame prior to refitting with larger sash weights for the double glazing and draft sealed parting and staff beads
25 / 64

existing sash frame prior to refitting with larger sash weights for the double glazing and draft sealed parting and staff beads

  • once the ceiling was removed the lack of structure to the dormer became apparent
  • environmentally sustainable bling -  hardwood (FSC cumaru) wet room, waxed polished plaster wall with refurbished original bath and window
  • refurbished original sash - now with draft sealed beads and double glazed units
  • new opening casement (FSC guariuba) fitted into existing frame
  • existing sash frame prior to refitting with larger sash weights for the double glazing and draft sealed parting and staff beads
  • the heat store (accumulator) going in through the wall
  • lowering the boiler down the back stpes in the pouring rain
  • the hole in the cellar with new insulated floor
  • the hole in the back of the house to get the heat store in through
  • the gable before any work (other than cleaning hatch for morso woodburner)
  • the half gable when we moved in
  • the front of the house, after doing the ground and first floor windows but before anything else
  • the sumptuous white render over the external insulation.
  • IMG_2628 hr
  • L1000128 med
  • IMG_8451 med
  • IMG_8453 med
  • IMG_8455 med
  • IMG_8456 med
  • IMG_8459 med
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.